Land Sales, Leases, and Development in the District
LOT SALES, LEASES & SUBDIVISION:
- Lot sales in District communities: click here for land sale terms and conditions. Inquiries can be sent to NMS@gov.sk.ca.
- Land sale and lease inquires outside of District communities: contact the Ministry of Environment. Lease agreements which exceed 10 years (together with any renewal terms), requires subdivision approval.
- Subdivision: the Community Planning branch, Ministry of Government Relations, is the approving authority for all subdivision applications in the province (outside of select larger municipalities). Click here for more information and online application form.
BUILDING PERMITS:
While the District and the Lac La Ronge Planning Area do not have a Building Bylaw or employ a Building Official, all property owners are legally responsible for complying with all legislated building, safety, accessibility and energy standards. Click here for more information on Codes and Standards.
Before starting construction, the following two forms are required to be submitted to NSADinfo@gov.sk.ca:
While the District and the Lac La Ronge Planning Area do not have a Building Bylaw or employ a Building Official, all property owners are legally responsible for complying with all legislated building, safety, accessibility and energy standards. Click here for more information on Codes and Standards.
Before starting construction, the following two forms are required to be submitted to NSADinfo@gov.sk.ca:
- SAMA Municipal Data Collection Form: under subsections 222(1) and (4) of The Northern Municipalities Act, 2010, a building owner is required to submit any information requested by an assessor for valuation purposes. Failure to provide requested information will affect the property owner's right to appeal (subsections 223(1,5,6) The Northern Municipalities Act, 2010).
- Notice of Intent to Build: section 7 of The Construction Codes Act requires the owner of a building to be constructed/added onto to notify the municipality of certain information contained in this form.
DEVELOPMENT PERMITS AND GUIDELINES:
Principal Building Setbacks (e.g. house):
Front Yard: 6 metres (19.6 feet)
Side Yard: 2 metres (6.5 feet)
Rear Yard: 4.5 metres (14.7 feet)
Accessory Building Setbacks (e.g. shed, garage):
Front Yard: 6 metres (19.6 feet)
Side Yard: 1.5 metres (4.9 feet)
Rear Yard: 1 metre (3.3 feet)
Corner Lots:
Drivers should have an unobstructed view around the corner. 6.1m/20ft from each corner is the recommended sight triangle dimension.
- Towns, Northern Villages and Northern Hamlets: please call the municipal office for development permit information.
- Lac La Ronge Planning Area: a development permit is required. The Planning area has an Official Community Plan and Zoning Bylaw.
- Northern Municipal District communities and the unorganized area outside of the Planning Area: a development permit is not required as this area does not have an Official Community Plan or Zoning Bylaw, however, the following property setbacks are recommended:
Principal Building Setbacks (e.g. house):
Front Yard: 6 metres (19.6 feet)
Side Yard: 2 metres (6.5 feet)
Rear Yard: 4.5 metres (14.7 feet)
Accessory Building Setbacks (e.g. shed, garage):
Front Yard: 6 metres (19.6 feet)
Side Yard: 1.5 metres (4.9 feet)
Rear Yard: 1 metre (3.3 feet)
Corner Lots:
Drivers should have an unobstructed view around the corner. 6.1m/20ft from each corner is the recommended sight triangle dimension.
ELECTRICAL PERMITS:
Electrical permitting and inspections are under the authority of the Technical Safety Authority of Saskatchewan (TSASK). Click here for more information.
Electrical permitting and inspections are under the authority of the Technical Safety Authority of Saskatchewan (TSASK). Click here for more information.
PLUMBING AND ON-SITE WASTE WATER/SEPTIC DISPOSAL PERMITS:
Plumbing permitting and inspections are under the authority of the Technical Safety Authority of Saskatchewan (TSASK). Click here for more information. Plumbing does not include on-site waste water/septic disposal systems, including holding tanks. If you plan on installing an on-site wastewater system (including holding tanks) or extending, repairing or altering an existing on-site septic system you will need to apply and get design approval from the local public health inspector. Please contact the Northern Saskatchewan Population Health Unit for inspection and permitting.
Plumbing permitting and inspections are under the authority of the Technical Safety Authority of Saskatchewan (TSASK). Click here for more information. Plumbing does not include on-site waste water/septic disposal systems, including holding tanks. If you plan on installing an on-site wastewater system (including holding tanks) or extending, repairing or altering an existing on-site septic system you will need to apply and get design approval from the local public health inspector. Please contact the Northern Saskatchewan Population Health Unit for inspection and permitting.
SHORELINE DEVELOPMENT PERMIT:
An Aquatic Habitat Protection Permit from the Water Security Agency (WSA) is required before doing work in or near the shoreline. Click here for more information and application form.
An Aquatic Habitat Protection Permit from the Water Security Agency (WSA) is required before doing work in or near the shoreline. Click here for more information and application form.
FIRESMART PRACTICES AND CONTROLLED BURNS:
Implementing as many FireSmart principles into your development plan is recommended. Click here for more information on FireSmart strategies from the Saskatchewan Public Safety Agency (SPSA).
From April 1 - Oct 31, a Burn Notification Number from the Saskatchewan Public Safety Agency (SPSA) is required under legislation and helps make sure that firefighters don’t respond unnecessarily to controlled burns. There are some exceptions. Click here for more information and application.
Implementing as many FireSmart principles into your development plan is recommended. Click here for more information on FireSmart strategies from the Saskatchewan Public Safety Agency (SPSA).
From April 1 - Oct 31, a Burn Notification Number from the Saskatchewan Public Safety Agency (SPSA) is required under legislation and helps make sure that firefighters don’t respond unnecessarily to controlled burns. There are some exceptions. Click here for more information and application.
SPECIAL EVENTS:
- A special event is a gathering that lasts for a limited time period, and includes a private family occasion such as a wedding, or an organized public event such as a community gathering, festival or celebration.
- Special events are not regulated by and do not require a permit from Northern Municipal Services.
- It is the responsibility of the event organizer to ensure all applicable healthy and safety regulations, bylaws, and licensing requirements are met.
- Concerns from the public should be directed to the event organizer.
DEFINTIONS:
Development means [except for temporary development] the carrying out of any building, engineering, mining or other operations in, on or over land or the making of any material change in the use or intensity of the use of any building or land (The Planning and Development Act, 2007).
Subdivision means a division of land that will result in the creation of a surface parcel, or the rearrangement of the boundaries or limits of a surface parcel (The Planning and Development Act, 2007).
Development means [except for temporary development] the carrying out of any building, engineering, mining or other operations in, on or over land or the making of any material change in the use or intensity of the use of any building or land (The Planning and Development Act, 2007).
Subdivision means a division of land that will result in the creation of a surface parcel, or the rearrangement of the boundaries or limits of a surface parcel (The Planning and Development Act, 2007).